Bushley and Ripple 23 Viaduct, M50

Back to Case Studies

This demolition project was to remove a disused viaduct over two water courses situated on the M50, overlying a flood plain. The two viaducts stretched a gap of 140 metres, adjacent to the live M50 motorway. An innovative working platform was installed to alleviate any impact to the local environment and state-of-the-art dust suppression was implemented to protect users of the motorway.

  • 500 TONNES OF STEEL RECYCLED
  • 8,000 TONNES OF CONCRETE PROCESSED ON-SITE FOR REUSE
  • OVER 280 METRES OF ROADWAY DEMOLISHED
  • 6 NO HEAVY PLANT OPERATING IN TANDEM