Speke Factory Buildings

Back to Case Studies

  • Consulting & Assessment
  • Demolition & Remediation
  • Onsite Bird Ecologist
  • Recovery & Recycling
  • Site Hoarding

Working as principal contractor for a full turnkey package of the remote Demolition of multiple warehouse and former factory buildings covering an 11 acre site.

This project included more than just demolition, our project management team undertook all aspects required for this project and delivered a full turnkey package, delivering elements such as extensive welfare, complete site hording, temporary works designs and installations, scaffolding, isolation’s of all services, licensed asbestos removal, topographical surveys, employment of an ecologist, basement and foundation demolition, and on-site crushing.

All works carried out within a busy industrial estate, close to dual carriageways and Liverpool Airport meant that all demolition activity would have to be planned carefully to en-sure there was no impact to the local environment. All Licensed and none-licensed asbestos was removed safely with advise sort from the HSE. Each building was brought down by 25, 35, 40, and 50 tonne excavators working in tandem. The buildings were brought to ground levels moxy’s and dumpers where utilised to transport materials across site and crushed to certified 6f2. Once all buildings had been demolished we brought up all the basements, tunnels, and foundations below ground level, again crushing all hardcore materials to type 6f2.

100% of all hardcore and scrap metals generated from the demolition was recycled.

This site was left in a safe and clean state ready for the new Home & Bargains flag ship store to be built by the following contractor. The client was extremely happy with the standard of our work, the flow of communication throughout the contract, and our eagerness to go that extra mile in ensuring all fundamental aspects of this project where met. We look forward to working with this client again in the future.

 

  • TURNKEY PROJECT
  • 11 ACRE SITE
  • LICENSED AND NON-LICENSED ASBESTOS REMOVAL
  • 10+ No. HEAVY PLANT UTILISED ON SITE
  • 7 MONTH PROJECT