Tea Pot Lane

M20 2018

Foot Bridge demolition

The removal of the Teapot Lane footbridge was an integral part of the M20 Smart Motorway Upgrade program and, thanks to our team, was completed 
within a restricted time frame and with minimal disruption for motorists.

The work required numerous complex lifts using a 450 tonne crane and specialist concrete cutting, as well as mechanical demolition techniques to reduce sensitive parts of the structure and the use of dust suppression systems. A temporary works design was issued for each stage of the demolition, which also required particular elements of the structures to remain intact ready for reuse when building the new bridge.